Tuesday, September 20, 2011

4.15

·         
4.15 use the relationship between power, work done (energy transferred) and time taken:

          power = work done            P = Wd

                       time taken                    t

P = Wd / t
P = E / t

P = Power (Watts, W)
Wd = Work Done (Joules, J)
E = Energy Transferred (Joules, J)
t = Time (s)

No comments:

Post a Comment